黄网视频无码视频|五月天色色播播|制服丝袜第一页在线|免费AA黄片a级片欧美|婷婷福利影院青草免费视频0|男人和女人性生活视频国产|无码高清黄色国产|成人1区2区久婷婷|国产综合激情网站|黄片最黄最色观看懂色AV

OA
CN

Danger elimination and reinforcement project of key (II) reservoir in Duchang County

Danger elimination and reinforcement project of key (II) res...
Danger elimination and reinforcement project of key (II) reservoir in Duchang County,the total construction period is 165 days and the total investment is 2814399.28 Yuan.

The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city

The Renovation project from Binjiang hotel to Guantang secti...
The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city is located in the urban area of Guanyang County, with a total construction period of 30 days and a total investment of 18132288 Yuan.

Small Hydropower station in Anhua County, Hunan Province

Small Hydropower station in Anhua County, Hunan Province
Small Hydropower station in Anhua County, Hunan Province.

High standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011

High standard farmland construction demonstration project of...
The total construction period of high standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011 is 120 days and the total investment is 3675699.44 Yuan.

Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project

Yichun Shanggao County in 2011, 40 small reservoirs reinforc...
Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project, with a total investment of 4144142.57 Yuan.

Longtan Hydropower Station in Guangxi Province

Longtan Hydropower Station in Guangxi Province
As the "West-to-East Power Tansmission" landmark project and the key project of the western development,Longtan Hydropower Station is the second largest hydropower station in China following the Three Gorgers Hydropower Station. The design water level is 400 meters, the dam height is 216.5 meters, the dam crest length is 836 meters, the storage capacity is 27.3 billion cubic meters, the installed capacity is 6.3 million kilowatts, and the annual power generation capacity is 18.7 billion kilowatt-hours.
目前在第1頁(yè), 共有1頁(yè), 共有6條記錄 第一頁(yè) 上一頁(yè) 1 下一頁(yè) 最后一頁(yè) 跳轉(zhuǎn)到頁(yè)